we offer you Steam coal that has been crushed according to International standard (ISO/ASTM) in Kalimantan Indonesia with specification follows:
High Calorie ( 6500 up)
Description GCV
ADB
6.500-6.300 Kcal
6.800-6.500 Kcal
7.200 – 6.800 Kcal
ARB
5,600 – 5,500
5,800 – 5,600
5,800 – UP
Total Moisture
ARB
9 – 14 %
8 – 13 %
8 – 13 %
Inherent Moisture
ADB
6 – 10 %
4 – 9 %
4 – 8 %
Ash Content
ADB
6 – 8 %
6 – 8 %
6 – 8 %
Volatile Matter
ADB
41 – 45 %
41 – 45 %
41 – 45 %
Fixed Carbon
by difference
by difference
by difference
Sulphur Content
ADB
max. 1 %
max. 1 %
max. 1 %
HGI
45 Min
45 Min
45 Min
Size General
0 – 50 mm 90%
0 – 50 mm 90%
0 – 50 mm 90%
Calorie 6200 up
Description GCV
ADB
6.300-6.100 Kcal
6.500-6.300 Kcal
6.800-6.500 Kcal
ARB
5,500 – 5,300
5,600 – 5,500
5,800 – 5,600
Total Moisture
ARB
16 – 18 %
9 – 12 %
8 – 11 %
Inherent Moisture
ADB
8 – 12 %
6 – 10 %
4 – 6 %
Ash Content
ADB
12 – 15 %
6 – 8 %
6 – 8 %
Volatile Matter
ADB
41 – 45 %
41 – 45 %
41 – 45 %
Fixed Carbon
by difference
by difference
by difference
Sulphur Content
ADB
max. 1 %
max. 1 %
max. 1 %
HGI
45 Min
45 Min
45 Min
Size General
0 – 50 mm 90%
0 – 50 mm 90%
0 – 50 mm 90%
Middel Calorie
Description GCV
ADB
5.800 – 5.600 Kcal
6.000 – 5.800 Kcal
6.300-6.100 Kcal
ARB
4,900 – 4,700
5,100 – 4,900
5,500 – 5,300
Total Moisture
ARB
26 – 30 %
22 – 28 %
16 – 18 %
Inherent Moisture
ADB
12 – 15 %
10 – 14 %
8 – 12 %
Ash Content
ADB
7 – 12 %
8 – 12 %
12 – 15 %
Volatile Matter
ADB
39 – 45 %
38 – 42 %
40 – 45 %
Fixed Carbon
by difference
by difference
by difference
Sulphur Content
ADB
max. 1 %
max. 1 %
max. 1 %
HGI
42 – 52 Min
42 – 50 Min
45 Min
Size General
0 – 50 mm 90%
0 – 50 mm 90%
0 – 50 mm 90%
Low Calorie
Description GCV
ADB
5.300 – 5.100 Kcal
5.500 – 5.300 Kcal
ARB
4,500 – 4,100
4,700 – 4,500
Total Moisture
ARB
34 – 40 %
32 – 36 %
Inherent Moisture
ADB
15- 20 %
11 – 18 %
Ash Content
ADB
12 – 15 %
8 – 13 %
Volatile Matter
ADB
40 – 45 %
40 – 44 %
Fixed Carbon
by difference
by difference
Sulphur Content
ADB
max. 1 %
max. 1 %
HGI
45 – 52 Min
46 – 52 Min
Size General
0 – 50 mm 90%
0 – 50 mm 90%
Quantity and capacity
1. Quantity / month : 50.000 – 600.000 MT per month each Kcalory (- No Trial shipment – )
Shipping Vessel Term
Anchorage Point : South kalimantan or East Kalimanat Muara Berau, Muara Jawa,.
Loading Port : South Kalimantan or East Kalimantan Kutai Kertanegara, Kutai Timur.
Delivery Time Loading : 35 – 45 days after receipt of comfirmed SBL/C on.
Surveyor : Geoservice/Sucofindo/Carsurin
Loading Rate / day : 11.000 – 16.000 mtn/day
IUP/KP locatiom : South Kalimantan and East Kalimantan Kutai Kertanegara, Kutai Timur.
Total Hectares of Kp(s) : 35.000 Ha ( 4 KP)
Production per annum : 6.000.000 Mt – 7.000.000 Mt
Jetty : Tanah Bumbu South Kalimantan and Dongdang East Kalimantan
Tidak ada komentar:
Posting Komentar